RAFT’s upgrades 2002-2004
Here is list of some the projects that we under took to get Raft ready for the journey south:
1. Sand blasted and Epoxy coated the bottom
2. Removed and replaced the plexiglass windows (used Plexus MA 560 to reinstall--worked great)
3. Rebuilt the Yanmar 3HM diesel-- engine showed some wear but was basically in good shape for twenty years of age. Thanks Ron
4. Built & installed a SS heat exchanger for the engine to keep the salt water out. Thanks to Bryan & Mike
5. Installed direct temperature gauge for cooling water
6. Installed hour meter to recorded engine operating time
7. Installed jiffy reefing on the main sail
8. Replaced continuous Hood Sea furl system with single line furling system.
9. Replaced all running rigging
10. Removed and replaced all mast wiring
11. Installed two runs of conduit in the mast to stop the "clang clang" and chafe of wiring
12. Installed new tri-colour mast head light and anchor light
13. Re insulated the ice box to improve efficiency of the refrigeration
14. Installed auto bilge pump
15. Modified the galley to increase storage and counter space
16. Installed new propeller shaft
17. Installed new dripless Seal
18. Installed new drive coupling. Thanks David
19. Installed new cutlass bearing
20. Rebedded two thru hulls
21. Removed all primary wiring and batteries and replaced with (6) Crown 6 volt lead acid golf cart batteries for total of 660 amp-hrs of storage
22. Installed 1500 watt Heart inverter with Link 1000 monitoring system
23. Installed high output alternator 95 amp with external Balmar voltage regulator
24. Installed new Dodger & Bimini with full screen and clear panel side curtain enclosure
25. Acquired new ground tackle -- 20 Kg Bruce with 40 feet of chain & 150 feet of Rode
26. Subdivided anchor locker into two compartments to handle second set of ground tackle
27. Installed additional blower in the engine compartment to reduce engine room temperature (with closed cooling the engine operating temperature has increased from 110 F to 175 F- this causes the alternator to overheat)
28. Relocated raw water strainer and Racor fuel filter for accessability
29. Installed 2 solar panels 90 watts each on Bimini
30. Installed Kiss wind generator
31. Rebuilt dinghy davits
32. Installed dinghy motor hoist
33. Purchased new main sail & new 110% jib
34. Purchased new trysail & storm Jib
35. Installed trysail track on mast.
36. Rebuilt the pulleys & sheaves on cabin top traveler
37. Greased rudder post and pedestal steering.
38. Upgraded the galley to include a U shaped counter/storage (thanks to Wally Bryant Stella Blue)
39. Purchased a new custom made mattress (7") for the V-berth
40. Repaired RADAR unit (thanks Nelson)
41. Linked the Autohelm to the GPS course correction
42. Upgraded the 110 volt wiring to GFIC
43. Installed SSB/Ham radio for email communication
44. Veritcal windlass with capstan, 35 lb CQR and 170 feet of chain
<< Home